
Cuprinol 5 Star Complete Wood Treatment - 1L
Minimum of 2/3 coats required.
Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc.
Treatment will typically dry in 1-3 days.
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Minimum of 2/3 coats required.
Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc.
Treatment will typically dry in 1-3 days.












